Reading a building quote line by line
Two quotes for the same extension can be thousands of pounds apart and both be honest. The difference is usually in what each one includes.
The scope
A good quote describes the work in enough detail that you could check it was done. Vague descriptions like 'build extension' leave room for disagreement later.
Inclusions and exclusions
Look for what is left out. Decorating, flooring, landscaping reinstatement, skip hire and fees for drawings or engineers are common exclusions. None is wrong, but you need to know.
Provisional sums
Where something cannot be priced until the job is under way, such as unknown ground conditions or hidden damp, a sum may be marked provisional. That is honest, but ask what the likely range is.
Payments and programme
Payments should be tied to stages of the work rather than dates, and you should be told the expected start, duration and any weather or supply risks. Be wary of large deposits.
Changes
Ask how changes are handled. A sensible process is a written note of the change and its cost, agreed before the work is done.