Snagging at the end of a building project
Even good work usually ends with a list of small things to put right. Snagging is the careful walk-round that finds them.
What snagging means
A snag is a small defect or unfinished item: a paint miss, a door that catches, a loose socket plate, a gap in sealant. Snagging is the process of finding them all and agreeing a date for putting them right. It is a normal part of every building project and not a sign that something has gone badly wrong.
Do it in good light
Choose a bright day, and look at each room systematically from top to bottom. Open and close every door and window, and run every tap and flush every toilet. Switch on every light and test every socket and appliance. Look along walls and ceilings from an angle, because low sunlight shows flaws in plaster and paint that you will not see head-on.
What to look for
Check the finish of paint, tiling and flooring, the alignment of units and worktops, and the sealing around baths, showers and sinks. Check that radiators heat up evenly, that extractor fans work, and that things you chose are the things that were fitted. Outside, check pointing, gutters, drains running freely, and that the site has been properly cleared.
Write it down
Make a numbered list with a photograph for each item, and give a copy to the builder the same day. Agree a time for the work to be completed, and mark off each item as it is done. It is reasonable to hold back a small, clearly agreed sum until the list is finished, but that should be set out in the contract at the start rather than raised as a surprise at the end.
Certificates and paperwork
Ask for the paperwork before final payment. Building Regulations work should end with a completion certificate from building control, electrical work should come with the appropriate certificate, and any gas or heating work should be certified too. Keep these in a folder with the plans, guarantees and manuals for new appliances. You will need them if you sell, and an insurer may ask for them.
Problems after you move back in
Some issues only show up with use, such as hairline cracks as new plaster dries, or a door that sticks in humid weather. Write these down as they appear and raise them promptly. Agree how the builder handles later defects, and what the process is, when you agree the contract. A calm, written, specific request gets the best response.
Who does the snagging
You can do the walk-round yourself, with the builder, or pay an independent inspector for a detailed report. For a small job, doing it yourself with a checklist is perfectly reasonable. For a large extension or a whole-house project, an independent view may find things you would not notice, and is worth considering.
What is not a snag
A snag is something that does not meet what was agreed. A change you decide you would prefer, or a feature you did not ask for, is a variation, and may carry a cost. Keep the two separate, and refer back to the written scope and drawings. Clear paperwork makes this conversation easy. If you are unsure which category an item falls into, ask the builder to explain, and ask for any agreed change to be written down with its price and its effect on the programme before the work is carried out. That habit protects both sides and keeps the final account free of surprises.
Related
Before you sign, read reading a building quote line by line. For the work itself see rear and side extensions and house renovations.
Free site visit and quote
Tell us about the project at hello@ramsgatebuilders.co.uk or on WhatsApp. We'll arrange a site visit to give you a proper quote.